What are the conditions before the installation of the ventilation pipe?
1.與管道有關(guān)的土建工程經(jīng)檢查合格,滿足安裝要求;
1. 、 civil engineering work related to the pipeline shall be inspected and qualified to meet the installation requirements;
2.設(shè)計(jì)資料及其他技術(shù)文件齊備,施工圖已經(jīng)會(huì)審,施工組織設(shè)計(jì)編制完畢并得到批準(zhǔn);
2. design documents and other technical documents are complete, the construction plan has been mixed, the construction organization design completed and approved;
3.與管道連接的設(shè)備安裝就位固定完畢,標(biāo)高、中心線、管口方位符合設(shè)計(jì)要求;
3.. The equipment connected with the pipe is installed in place and fixed. The elevation, center line and nozzle orientation meet the design requirements;
4.必須在管道安裝前完成的有關(guān)工序,如清洗、脫脂、內(nèi)部防腐與襯里等已進(jìn)行完畢;
4. necessary procedures such as cleaning, degreasing, internal corrosion protection and lining must be completed before the pipeline is installed;
5.管子、管件及閥門等已經(jīng)檢驗(yàn)合格,并具備有關(guān)的技術(shù)證件;
5. pipes, fittings and valves have been inspected and have relevant technical certificates;
6.管子、管件及閥門等已按設(shè)計(jì)要求核對無誤,內(nèi)部已清理干凈,不存雜物;
6. pipes, fittings and valves have been checked according to the design requirements, the internal cleaning has been done, no debris;
7.地下管溝開挖完畢,裝置管廊施工完畢。
7. the excavation of the underground pipe ditch is completed and the pipe gallery is completed.