通風(fēng)管道的防腐保溫和安裝吊架要注意什么?

來(lái)源:http://www.glsytz.com/     發(fā)布時(shí)間:2024-03-17  

通常使用鍍鋅風(fēng)管,不銹鋼管用于腐蝕性和特別潮濕的地方。當(dāng)環(huán)境空氣濕度較高時(shí),風(fēng)道外壁應(yīng)進(jìn)行防腐防銹處理。輸送高溫高濕的風(fēng)道內(nèi)壁應(yīng)噴涂磷化底漆或其他防腐涂料。當(dāng)風(fēng)道輸送高溫氣體或低溫空氣時(shí),風(fēng)道外壁應(yīng)進(jìn)行保溫(冷保)處理。

Galvanized air ducts are usually used, while stainless steel pipes are used in corrosive and particularly humid areas. When the ambient air humidity is high, the outer wall of the air duct should be treated with anti-corrosion and rust prevention. The inner wall of the air duct conveying high temperature and high humidity should be sprayed with phosphating primer or other anti-corrosion coatings. When the air duct transports high-temperature gas or low-temperature air, the outer wall of the air duct should be insulated (cold preserved).

輸送高溫氣體的風(fēng)道的隔熱目的是防止管道中空氣的熱量損失(冬季出現(xiàn)在集中式空調(diào)系統(tǒng)中)。在輸送廢熱蒸汽或高溫氣體時(shí),為了防止熱量傳遞到室內(nèi)并使室溫升高,可以防止人再次接觸風(fēng)管并燙傷。在夏季,當(dāng)輸送氣體的溫度低于周圍環(huán)境的空氣露點(diǎn)溫度時(shí),通風(fēng)管道外壁會(huì)產(chǎn)生冷凝現(xiàn)象??照{(diào)系統(tǒng)的空氣管道會(huì)增加冷卻損失,冷凝水滴會(huì)污染天花板和墻壁地板。因此,還應(yīng)進(jìn)行冷卻和隔熱處理。

The insulation purpose of the air duct transporting high-temperature gas is to prevent heat loss of the air in the pipeline (which occurs in centralized air conditioning systems in winter). When transporting waste heat steam or high-temperature gas, in order to prevent heat from being transferred indoors and raise the room temperature, it is possible to prevent people from coming into contact with the air duct again and getting burned. In summer, when the temperature of the transported gas is lower than the dew point temperature of the surrounding air, condensation will occur on the outer wall of the ventilation duct. The air ducts of the central air conditioning system will increase cooling losses, and condensation droplets will contaminate the ceiling and walls and floors. Therefore, cooling and insulation treatment should also be carried out.

以上是通風(fēng)管道防腐保溫的原因。只有防腐才能減少后期使用中的腐蝕,所以我們應(yīng)該注意這些方面,并盡量保證在以后使用時(shí)更光滑,效果更好。

The above are the reasons for the anti-corrosion and insulation of ventilation ducts. Only anti-corrosion can reduce corrosion in later use, so we should pay attention to these aspects and try to ensure smoother and better results in future use.

沈陽(yáng)通風(fēng)管道

Shenyang ventilation duct

關(guān)于通風(fēng)管道施工時(shí)安裝吊架有哪8項(xiàng)規(guī)定

What are the 8 regulations for installing hangers during ventilation duct construction

1.根據(jù)風(fēng)機(jī),空調(diào)機(jī)組,風(fēng)扇板等設(shè)備的支架和吊架的設(shè)計(jì)要求,設(shè)置隔振器,濟(jì)南通風(fēng)管道的其品種和規(guī)格應(yīng)符合設(shè)計(jì)和產(chǎn)品技術(shù)文件的要求。

According to the design requirements of the brackets and hangers for equipment such as fans, air conditioning units, and fan boards, vibration isolators should be installed. The variety and specifications of Jinan ventilation ducts should meet the requirements of the design and product technical documents.

2.風(fēng)道應(yīng)垂直安裝,間距不超過(guò)4米。單根直管應(yīng)少有兩個(gè)固定點(diǎn)。

20230511102913339.jpg

2. The air duct should be installed vertically with a spacing of no more than 4 meters. A single straight pipe should have at least two fixing points.

3.吊架的螺孔應(yīng)加工,吊桿應(yīng)筆直,線頭完整光滑。

3. The screw holes of the suspension bracket should be machined, the suspension rod should be straight, and the thread head should be complete and smooth.

4.對(duì)于長(zhǎng)度超過(guò)20米的水平懸掛風(fēng)道,在通風(fēng)管道施工期間少應(yīng)設(shè)置一個(gè)防搖支架。

For horizontal suspended air ducts with a length exceeding 20 meters, at least one anti shake bracket should be installed during the construction of the ventilation duct.

5,支架和吊架不應(yīng)設(shè)置在風(fēng)口,閥門,檢查門和自動(dòng)控制機(jī)構(gòu)中,與風(fēng)口或插頭連接的距離不應(yīng)小于200mm。

5. Brackets and hangers should not be installed in air vents, valves, inspection doors, and automatic control mechanisms, and the distance connected to air vents or plugs should not be less than 200mm.

6,當(dāng)水平懸掛主干管和干空氣管道長(zhǎng)度超過(guò)20m時(shí),應(yīng)設(shè)置防止擺動(dòng)的固定點(diǎn),每個(gè)系統(tǒng)應(yīng)不小于1。

When the length of the horizontally suspended main pipe and dry air pipeline exceeds 20m, fixed points to prevent swinging should be set up, and each system should not be less than 1.

7,蒸汽水管應(yīng)按標(biāo)準(zhǔn)圖紙和規(guī)格及規(guī)格形式選擇適合的強(qiáng)度和剛度,濟(jì)南通風(fēng)管道的直徑或長(zhǎng)度超過(guò)2500㎜超寬,超重專用風(fēng)管分支,吊架應(yīng)在規(guī)定的設(shè)計(jì)。

7. Steam water pipes should be selected with appropriate strength and stiffness according to standard drawings, specifications, and forms of specifications. The diameter or length of Jinan ventilation pipes should exceed 2500mm for ultra wide, overweight specialized air duct branches, and hangers should be designed according to regulations.

8.安裝后,每個(gè)輔助支架和吊架的應(yīng)力應(yīng)均勻,無(wú)明顯變形。空氣管道或空調(diào)設(shè)備使用的可調(diào)隔振支架和吊架的拉伸或壓縮量應(yīng)根據(jù)設(shè)計(jì)要求進(jìn)行調(diào)整。

8. After installation, the stress on each auxiliary bracket and hanger should be uniform without significant deformation. The tension or compression of adjustable vibration isolation brackets and hangers used in air ducts or air conditioning equipment should be adjusted according to design requirements.