熱鍍鋅風(fēng)管的安裝需要留意的事項(xiàng)!

來源:http://www.glsytz.com/     發(fā)布時(shí)間:2023-11-20  

因而要搞好把握多用途消音管的工藝特點(diǎn),了解施工圖紙,掌握土建工程和其他技術(shù)工種同本工種的有關(guān)狀況,核查風(fēng)管系統(tǒng)軟件的設(shè)計(jì)標(biāo)高,中心線、預(yù)埋孔眼,埋件等能否合乎安裝標(biāo)準(zhǔn)。備齊安裝用的各種輔材,準(zhǔn)備好吊裝機(jī)具和安裝用的其他專用工具,對(duì)風(fēng)管系統(tǒng)軟件畫線定位等工作中。

Therefore, it is necessary to grasp the process characteristics of multi-purpose silencing pipes, understand construction drawings, grasp the relevant conditions of civil engineering and other technical trades with this profession, and verify whether the design elevation, centerline, embedded holes, embedded parts, etc. of the air duct system software meet the installation standards. Prepare various auxiliary materials for installation, prepare lifting equipment and other special tools for installation, and perform line drawing and positioning work on the air duct system software.

起吊前,要對(duì)風(fēng)管支、支架,吊裝機(jī)具,采用吊裝機(jī)具的支、起吊點(diǎn),是不是恰當(dāng)、堅(jiān)固開展查驗(yàn),吊裝前應(yīng)認(rèn)真仔細(xì),把桿、滾輪、繩鎖等是不是固定不動(dòng),捆扎靠譜并要起吊范疇內(nèi)的多種不穩(wěn)定要素。吊裝時(shí),要開展試吊,當(dāng)距地200-300Mm時(shí),終止起吊,再一次對(duì)吊裝機(jī)具開展一次查驗(yàn),確定沒有問題后,再次起吊到所需相對(duì)高度。把風(fēng)管固定不動(dòng)在支、支架上以后,才可以解除繩鎖,拆移吊裝機(jī)具。

171x119_crop.jpg

Before lifting, it is necessary to inspect whether the support and lifting points of the air duct support, bracket, and lifting equipment are appropriate and sturdy. Before lifting, it is necessary to carefully check whether the rod, roller, rope lock, etc. are fixed and fixed, and the binding is reliable. Multiple unstable elements within the lifting scope should be eliminated. When lifting, a trial lifting should be carried out. When the distance from the ground is 200-300Mm, the lifting should be terminated, and the lifting equipment should be inspected again. After confirming that there are no problems, the lifting should be lifted again to the required relative height. Only after fixing the air duct on the support and bracket can the rope lock be released and the lifting equipment be removed.

風(fēng)管的組對(duì):將制成品或預(yù)制構(gòu)件好的風(fēng)管運(yùn)到安裝地址,聯(lián)系實(shí)際情形開展查驗(yàn)、核查,再按序號(hào)開展排序,風(fēng)管系統(tǒng)軟件的各部位外形尺寸和視角確確準(zhǔn)確無誤后,即逐漸風(fēng)管組對(duì)工作中。風(fēng)管各管段中間的聯(lián)接選用法蘭聯(lián)接,連接處規(guī)定嚴(yán)實(shí)不透風(fēng)。一次起吊風(fēng)管的長度要依據(jù)房屋建筑的標(biāo)準(zhǔn),風(fēng)管的厚度,起吊方式和吊裝機(jī)具配置狀況明確,組對(duì)好的風(fēng)管可把兩邊的法蘭作為標(biāo)準(zhǔn),以正中間法蘭為測(cè)量點(diǎn),吊線測(cè)量風(fēng)管的聯(lián)接是不是豎直,誤差大時(shí)要開展調(diào)節(jié)

Assembly of air ducts: Transport the finished or prefabricated air ducts to the installation location, conduct inspection and verification based on the actual situation, and then sort them by serial number. After the external dimensions and perspectives of each part of the air duct system software are confirmed to be accurate, gradually assemble the air ducts. The connection between each section of the air duct adopts flange connection, and the connection is strictly regulated to be airtight. The length of the air duct to be lifted at once should be based on the standards of the building, the thickness of the air duct, the lifting method, and the configuration of the lifting equipment. The assembled air duct can use the flanges on both sides as the standard, with the middle flange as the measurement point. The suspension line should measure whether the connection of the air duct is vertical, and adjustment should be carried out when there is a large error

本文由濟(jì)南排煙罩友情奉獻(xiàn).更多有關(guān)的知識(shí)請(qǐng)點(diǎn)擊:http://www.glsytz.com   真誠的態(tài)度.為您提供為的服務(wù).更多有關(guān)的知識(shí)我們將會(huì)陸續(xù)向大家奉獻(xiàn).敬請(qǐng)期待.

This article is dedicated to the friendship of Jinan smoke exhaust hood. For more relevant knowledge, please click on: http://www.glsytz.com Sincere attitude. We will provide you with comprehensive services. We will gradually contribute more relevant knowledge to everyone. Stay tuned